Local Centre-Buxton

Archers Steelwork & Cladding: Buxton Project Recap

Welcome back to our vlog! Today, we’re excited to share the successful completion of a project for our longstanding client in Buxton.

Project Overview

Scope of Work: We expertly managed the design, supply, and installation of:

  • Structural steelwork
  • Roofing
  • Cladding
  • Rainwater goods

Location: Buxton, England

Project Details

Construction Materials: This building incorporated a variety of materials, including a brick tile system bonded to cementitious weatherboard. Our team ensured these materials worked seamlessly together.

Installation Process: Due to the project timeline, a rapid installation was required. Our skilled installation team rose to the challenge and completed the project efficiently without compromising on quality.

Smooth Integration: We pride ourselves on providing a seamless interface for steelwork, roofing, and cladding. Our comprehensive design and build solution not only streamlines the design process but also ensures smooth coordination between different trades.

Client Satisfaction and Future Prospects

We are extremely pleased with the outcome of this project and are grateful for the opportunity to work with this valued client once again. A huge thank you to everyone involved in making this project a success.

This project is a testament to our belief that Together Everyone Achieves More. We look forward to future collaborations and continuing to deliver excellence.

Reference

“Archers Steelwork & Cladding Ltd (Archers) were appointed as Subcontractors to deliver the Steel Frame, Roofing and Cladding works on our multi-unit retail project in Buxton, on behalf of developer Client Henry Davidson Developments.

Archers were effective throughout the project, ensuring works were delivered to a high standard, without compromising the overall project programme. There was constant communication between Archers and our on-site management team.

I was particularly impressed with Archers during the design stage and the quality of detail shown within the drawing issues. This gave us plenty of confidence moving into the Construction phase, during which Archers were equally assuring.

We would have no operation objection as engaging Archers again for similarly natured works.”

Josh Partington

Project Manager