This project incorporated all difference aspects off our supply. Complete new extension portal frame 30meters span x 50meters with office area to the front of the building connected to existing structure whilst existing building was in full use. New Link Bridge installed from existing building to new.
Steel frame erected cladding install with restricted access, crane to have slew restrictions due to the proximity of neighbouring properties and overhead power cables.
Cladding system utilised built up systems and compost horizontally laid panels. Survey of existing building carried out by Archers the whole project looks fantastic.