Warwick University

20T Steel frame

120m2 Structural decking

This project required different types of erection 1/3rd  of the steel frame had to be erected by hand using genie lifts and bogey trucks inside the existing classroom with access through personnel door. The remainder of the frame could be erected using crane out of normal working hours over the top of an existing building.

We then organised decking to be delivered with a steel frame to enable decking packs to be landed on steel frame during erection.

Once the frame lined levelled and grouted the netting edge protection was struck, decking & studs fixed, concrete poured & cured, netting & edge protection down job done.